Anyone who was alive to remember July 21, 1969, can still recall the sight of Neil Armstrong stepping for the first time on to the moon’s surface. I was 11 years old at the time, sitting with my family around our black-and-white TV when Armstrong proclaimed, "That's one small step for man, one giant leap for mankind." I was proud to be an American.

Seventeen years later, January 28, 1986, different room, different TV, but the same feeling of exhilaration as the Space Shuttle Challenger headed off for the dark side of the moon. But 73 seconds later the coin flipped and the spacecraft exploded, killing all seven crewmembers. Seventeen percent of all Americans were watching as the external tank containing the liquid hydrogen fuel and liquid oxygen oxidizer exploded. To this day, the Challenger disaster is a case study in engineering safety and workplace ethics.

What lessons can we learn from what went wrong that day? How could this disaster have been avoided by following a simple risk management process? To understand, we must examine the Challenger disaster using the five steps of risk management, which are:
1.  Identify Risk — NASA managers had known the design of the solid rocket boosters (SRBs) contained a potentially catastrophic flaw in the O-rings since 1977, but failed to address it properly.
2.  Analyze Data — The O-rings, as well as other critical components, had no test data to support the expectation of a successful launch in such cold conditions. Engineers who

worked on the Shuttle delivered a biting analysis: “We're only qualified to 40° F. No one was even thinking of 18° F. We were in no man's land.”
3.Control Risk — NASA had “Launch Fever” that morning and disregarded advice not to launch. Later, we learned that concerns about the launch never made it up the chain of command. It was these lapses in judgment that triggered this catastrophic event.
4.  Transfer Risk — While there may be some risk transferred to an insurance company for a satellite aboard, there is no place to transfer the loss of life in this case. NASA put all shuttle launches on hold for 32 months and some would argue that they never recovered from the damage to their reputation.
5.Measure Results — This is where we ask the question, “What went wrong?” In fact, the Rogers Commission did an extensive review. They found NASA’s organization culture and decision-making processes had been key contributing factors to the accident. NASA managers had known since 1977 that the design of the solid rocket boosters (SRB’s) contained a potentially catastrophic flaw in the O-rings yet failed to address it properly. They also disregarded warnings (an example of “go fever”) from engineers about the dangers of launching because of the low temperatures that morning, while also failing to adequately report these technical concerns to their superiors.

Establishing a Safety Culture

So, how do we avoid this happening in your business? It’s all about establishing a safety culture.  And, the ways in which safety is managed in the workplace often reflects the attitudes, beliefs, perceptions and values that employees share in relation to safety. Are senior leaders hearing the “real” story of what is going on, and does it trickle down all the way to the hourly worker that only came on board a week ago?

It never ceases to amaze me the risk we uncover when we go looking. During a recent risk assessment at a manufacturer we discovered they had a Hilo driver that was declared legally blind, but knew the factory floor so well that even with extremely limited eyesight the employer felt he could still do his job. Fortunately this optimistic viewpoint didn’t fare well with the senior manager who reassigned the employee was reassigned to a job in the warehouse, where it was unlikely he would run over a co-worker with a 2,000-lb forklift.

Another time we were analyzing workmen’s comp claim data at a trailer repair facility where we noticed several eye injuries had occurred recently because rust particles were getting past the safety glasses. We contacted a safety glasses supplier, explained the problem and asked for their recommendations. They provided a few samples of safety glasses that were designed to prevent the rust particles from getting in the worker’s eyes. The employer replaced the old glasses with the new model and there hasn’t been an eye injury in the past two years.

Unfortunately every story doesn’t have a happy ending.  On the morning of November 5, 2003, Kristi Fries, an employee at Maverick Metal Stamping in Mancelona, Mich., reached to remove a part from a 110-ton stamping press. Her unzipped sweatshirt triggered the machine's controls, causing the press to slam down and crush her arms, both of which had to be amputated between the wrist and the elbow. Fries later said it was her first time using the machine, and that she had never been warned about the risk of wearing loose clothing while operating the machine, nor that the machine had previously malfunctioned.

In fact, the potential danger of the machine was so widely known that the regular operator wore his button down shirt backwards to make sure it he had no loose clothing in front that could trigger the machine. Sadly, no one thought to bring this potential danger to Fries’ attention.

This is the perfect example of risk management failure. The risk was identified but never addressed. After the accident it was discovered that the parts to fix the machine had been in the maintenance department for over two years. Not only did Fries loose both her arms, the company was hit with over $300,000 in OSHA fines and subsequently went out of business, resulting in a loss of jobs for 50 people.

Two Critical Mistakes

So what can we learn from the Space Shuttle tragedy, caused by an “O” ring failing just over a minute after lift-off? Manufactured by Morton-Thiokol, the O-rings had worked on all 24 previous shuttle flights. But, all of those launches took place with a temperature of at least 51°F.  At 11:38 AM on January 28, the morning of lift-off, the outside temperature at the launch pad was 36°F.

A critical mistake had been made by at least two parties: NASA and Morton-Thiokol. Morton-Thiokol knew that there was risk in maintaining the integrity of the O-ring at such a low temperature, but so did NASA, which had ultimate responsibility for the launch. The result was seven lost souls.

Wayne Hale, a former NASA flight director and Space Shuttle Program manager, cited 10 lessons that can be learned from this catastrophe:
1.  It can happen to you.  Nobody is smart enough to avoid all problems. A preoccupation with failure results in high reliability organizations.
2.  Focus. “Aviation in itself is not inherently dangerous. But, it is terribly unforgiving of any carelessness, incapacity, or neglect.” –Captain A. G. Lamplugh, RAF.
3.  Speak up.  A foolish question is more forgivable than a mistake. Loss of respect, loss of your job, loss of a promotion pale compared to program shutdowns, life-long regret and funerals.
4.  You are not nearly as smart as you think you are.  There is a reason we all have one mouth and two ears. Too many people are so busy giving their thoughts that they fail to hear warnings of a disaster. Don’t just listen, comprehend and take action.
5.  Dissension has tremendous value. No dissension means the issue hasn’t been examined enough. Appoint devil’s advocates and don’t allow people to remain silent—draw them out.
6.  Question conventional wisdom. People in groups tend to agree on courses of action that, as individuals, they know are stupid. Told that the shuttle was as safe as an airliner, we denied the shuttle crew parachutes and pressure suits — something patently wrong to a casual observer.
7.  Do good work. There is no room for half-hearted efforts or second best. Do it well or don’t do it at all. Don’t accept excuses from others.
8.  Any analysis without numbers is only an opinion.  Engineering is done with numbers. Not having all the information you need is never a satisfactory excuse for not starting an analysis.
9.  Use your imagination. Keep vigilant and have an active imagination of possible hazards. Murphy wasn’t completely wrong when he wrote his law.
10.  Nothing worthwhile is accomplished without taking risk. At some point we must leap into the unknown without knowing everything we should know. Fear, or a preoccupation with failure, cannot and should not paralyze us into inaction. Make the risk of those who put their life on the line as small as possible, then go forward.

It’s only by identifying the risks you face each day as a business, and having a plan in place to minimize them, that will you succeed as a company that truly cares not only about the bottom line but also the human capital that makes your business run.

Randy Bossis a Certified Risk Architect at Ottawa Kent, a commercial insurance, risk management, workers' comp and employee benefits consulting business in Jenison, Mich. He designs, builds and implements risk management and insurance plans for middle market companies in the areas of human resources, property/casualty and benefits.

TAGS: CMM and QC

Maker of the world's leading risk and decision analysis software, @RISK & the DecisionTools Suite
Brazilian Petroleum Institute
Product: @RISK
Application:Oil Exploration
Bucknell University
Product: PrecisionTree
Application:Technology Implementation
Cambridge University
Product: @RISK
Application: Climate Change
Columbia University
Product: @RISK
Application: Energy and Public Policy
Cornell University
Product: @RISK
Application: Financial Management
Curtin University of Technology
Product: @RISK
Application: Statistical analysis
DePaul University/Advanced Analytics LLC
Product: DecisionTools Suite
Application: Sports Wagering
Illinois State University
Product: @RISK
Application: Pharmaceutical R&D, Net Present Value, Internal Rate of Return
Illinois State University
Product: @RISK
Application: Real Options and Finance
INCAE Business School
Product: @RISK
Application: Finance and Capital Markets
Johnson Graduate School of Management, Cornell University
Product: @RISK
Application: Election Forecasting
Missouri University of Science and Technology
Product: @RISK
Application: Mining Engineering
Pace University
Product: StatTools, DecisionTools Suite
Application: Operations Research
Shanghai Jiao Tong University
Product: DecisionTools Suite
Application: Engineering system design and optimization
Swinburne University of Technology
Product: @RISK
Application: Venture Capital Management
Technical University of Denmark
Product: @RISK
Application: Transportation research
Tulane University
Product: @RISK
Application: Food Safety
University of Adelaide
Product: @RISK
Application: Prediction of metal corrosion in salt water
University of Houston
Product: DecisionTools Suite
Application: Managerial Decision Making
University of London Royal Veterinary College / EpiX Analytics
Product: @RISK
Application: Health and food safety
University Melbourne
Product: @RISK
Application: Forecasting Dairy Operating Profits
University of New Brunswick
Product: @RISK
Application: Reducing Environmental Impact of Commercial Aquaculture
University of Pennsylvania
Product: DecisionTools Suite
Application: Organizational Dynamics
University of Pretoria
Product: DecisionTools Suite, @RISK, TopRank
Application: Viral Exposure
University of Toronto
Product: DecisionTools Suite
Application: Financial Management
University Of Victoria
Product: @RISK
Application: Lifetime Excess Cancer Risk
University of Witwatersrand
Product: @RISK
Application: Mining Engineering
Virginia Commonwealth University
Product: @RISK
Application: Value at Risk Analysis

READ ALSO
In Agriculture:
Cornell University / Purdue University
Product: @RISK
Application: Agriculture Policy Assessment
University of Buenos Aires
Product: @RISK
Application: Agricultural Investment
University of Tokyo
Product: @RISK
Application: Agriculture
In Environment:
Cornell University /
Lower Colorado River Authority
Product: @RISK
Application: Natural Resource Mgmt
In Energy:
Cranfield University
Product: @RISK
Application:Equipment Reliability
In Finance:
London Business School /
Novartis Pharmaceutical
Product: @RISK, PrecisionTree, RISKOptimizer, DecisionTools Suite
Application: Portfolio Management
In Medical:
Royal Veterinary College
Product: @RISK
Application: Disease Prevention
Abu Dhabi Water &
Electricity Company
Product: @RISK
Application:Demand Forecasting
Águas do Douro e Paiva
Product: @RISK
Application:Cost Reduction
Alesco Risk Management
Services Limited
Product: @RISK
Application:Risk modelling to determine optimum risk financing and insurance strategies
BC Hydro
Product: @RISK
Application:Project Analysis
Bigen Africa
Product: @RISK
Application:Demand and Cost Forecasting
Blade Energy
Product: @RISK
Application:Drilling Productivity
Carnegie Mellon University / Pittsburgh Technical
Product: @RISK
Application:Mitigating project schedule and cost overrun risk
Cinergy
Product: @RISK
Application:Acquisitions Analysis
Cranfield University
Product: @RISK
Application:Equipment Reliability
Det Norske Veritas (DNV)
Product: @RISK
Application:ROI of Different Projects
ECN
Product: @RISK
Application:Financial analysis of offshore wind farms
Enex
Product: DecisionTools Suite
Application:Project Planning
Fitness First
Product: @RISK, RISKOptimizer
Application: Energy Budget Resilience Optimization
Fluor Corporation
Product: @RISK
Application: Oil and Gas Estimating
Futuremetrics
Product: @RISK
Application: Price Hedging
Grupo ISA
Product: @RISK
Application: Investment Analysis
Hydroelectric Power in Colombia
Product: @RISK
Application: Cost estimation
IHS Energy Group
Product: @RISK Developer Kit
Application: Exploration, Drilling, and Production Analysis
Integrating Renewables with Electricity Storage
Product: @RISK
Application: Energy supply and Electricity Demand
Kinder Morgan / Riskcore Ltd.
Product: @RISK
Application: Modelling project cost contingency and escalation
L.E. Peabody & Associates
Product: @RISK
Application:Real Option Valuations of Power Plants
Major Utility in Eastern US
Product: The DecisionTools Suite
Application: Load Forecasting
Metaproject
Product: @RISK, PrecisionTree
Application: Rescue Operations
National Grid UK
Product: @RISK
Application: Modeling electricity network restoration
Northern Indiana
Public Service Company
Product: @RISK, Evolver, RISKOptimizer
Application: Pricing, Production Allocation for Regulation Compliance
Petrobras
Product: @RISK
Application: Exploration & Production
Red Leaf Resources
Product: @RISK
Application:Developing new oil shale technologies
RiskAdvisory
Product: @RISK Developer Kit
Application: Energy Production and Pricing
Rudd Asset Management (RAM)
Product: @RISK
Application: Waste disposal and renewable energy
Sark7
Product: Decision Tools Suite (@RISK, Precision Tree and Evolver)
Application: Optimising the business case for sustainable energy projects
Sinopec Engineering (Group) Co., Ltd (SEG)
Product: @RISK
Application: Evaluate petroleum and petrochemical projects valued over US$100m
Tesla Consultants
Product: @RISK
Application: Assessing Needs for Equipment Upgrades
Throughput Professionals
Product: @RISK
Application: Refinery Optimization
Tioga Energy
Product: @RISK
Application: Solar energy savings
Transelectrica
Product: @RISK
Application: Measuring and Mitigating Open Market Risk
WEnergy Global
Product: @RISK
Application: Return on Investment

SEE ALSO:
Halcrow
Product: @RISK
Application: Flood Protection

SEE ALSO: INDUSTRY MODELS
»Energy Models

Albert Fensterstock Associates
Product: NeuralTools
Application: Credit and debt risk analysis
Benemerita Universidad Autonoma de Puebla
Product: @RISK
Application: Derivatives Pricing
Cynametrix
Product: DecisionTools Suite
Application: Portfolio Optimization including IDB
Federal Home Loan Bank of Indiana
Product: @RISK
Application: Portfolio Credit Risk
FiduciaryVest
Product: @RISK
Application: Asset Allocation, Value-at-Risk
George Washington University
Product: @RISK & RISKOptimizer
Application: Debt Portfolios, Capital Investments
London Business School /
Novartis Pharmaceutical
Product: @RISK, PrecisionTree, RISKOptimizer, DecisionTools Suite
Application: Portfolio Management
LStar Capital
Product: @RISK
Application: Risk Quantification in Film Financing
Merck
Product: @RISK
Application: Value-at-Risk Exchange Rate
Netconomy
Product: @RISK
Application: Budget Forecasting
Nighthawk Intelligence
Product: DecisionTools Suite
Application: Private label credit card (PLCC) accounts for major electronics retailer
Performance Thinking & Technologies
Product: @RISK & RISKOptimizer
Application: Hedge Fund management
Procter & Gamble
Product: @RISK, PrecisionTree, DecisionTools Suite
Application: Production Siting, New Product Analysis, Exchange Rate Analysis, Real Options
Risqworx
Product: @RISK
Application: Calculating investment risk and ROI
Rusnano
Industry: Finance/Banking
Application:Private equity investment in nanotechnology
RoseCap Investment Advisors
Product: @RISK
Application: Valuation of Direct Investment

READ ALSO
In Academic:
Swinburne University of Technology
Product: @RISK
Application:Venture Capital Management
In Energy:
Cinergy
Product: @RISK
Application:Acquisitions Analysis
Grupo ISA
Product: @RISK
Application: Investment Analysis
In Government:
Her Majesty's Prison Service
Product: @RISK
Application: Cash Flow Analysis
In Insurance/Reinsurance:
Society of Actuaries /
Casualty Actuary Society
Product: @RISK
Application: Pension and Insurance Planning

SEE ALSO: INDUSTRY MODELS
»Finance/Banking Models
Categories: 1

0 Replies to “Risk Management Case Study Nasa News”

Leave a comment

L'indirizzo email non verrà pubblicato. I campi obbligatori sono contrassegnati *